2020 Energy Fabrication Hot Oiler - Unit 2
2020 Energy Fabrication Hot Oiler - Unit 2
$400,000 (USD)
Description
2020 Energy Fabrication Hot Oiler - Unit 2
7M BTU/HR
2" STD. COIL ASSEMBLY DOMESTIC MATERIAL
ANSUL REMOTE FIRE SUPPRESION
CERAMIC FIBER INSULATION WITH STAINLESS MESH
ECO AIR BURNERS W/ PILOT IGNITION
STEEL VAPORIZER WITH PRE-HEATER
NO SPILL BURNER BOX FLOOR WITH DRAIN
WIND PROOF PILOT FOR BURNER OPERATION
600 S GARDNER DENVER 4.5" PLUNGERS WITH LUBE OIL TANK
2-2" H.P. BALL VALVES WITH HI-TEMP SEATS 6K
1-2" H.P. CHECK VALVE 6K
2" SUCK BACK LINE
1-1" BLEEDER VALVE
3"X2"X13" DURCO CENTRIFUGAL PUMP - HYDRAULIC DRIVE
3" SCH 40 SUCTION PLUMBING WITH BUNA/SST BUTTERFLY VALVES
2" SCH 40 L.P. PLUMBING
7-2" SST JAMESBURY BALL VALVES
1-2" 3,000# COIL CHECK VALVE
3" BOWIE LOAD PUMP - HYDRAULIC DRIVE
3" LOAD & TRANSFER PLUMBING
3-3" OUTLETS, BOTH SIDES AND REAR -3 AIR ACTUATED TANK VALVES
1-2" SUCTION ON PASSENGER SIDE
CHAIN RACK PASSENGER SIDE - NO CHEMICAL TANK
GREASE FITTINGS TO BOWIE & TRIPLEX
75 BBL ROUND STORAGE - NON CODE
DUAL COMPARTMENT- SPLIT 50-25
SST SEE LEVEL GAUGES W BRACKETS ON END OF WALKWAY
VACUUM & PRESSURE EMERGENCY VENT
20" TOP MANWAYS CB WITH 4 LUGS ( CLAY & BAILEY)
1 INTERNAL HEAD
ROLLOVER W/ INTERGRAL SPILL TRAY
POSITIVE TANK VENT SYSTEM
1/4" SHELL & HEAD MATERIAL
INTERNALLY COATED W/ TNEMEC 141
TUBULAR ACCESS LADDER W/ WALKWAY
CLEARANCE LIGHTS AND 5 WORK LIGHTS
LOAD HOSE ALONG DR SIDE
480 GALLON PROPANE TANKS DUAL STACK
HOSE REEL WITH 75’-1 ½” HOT OILER HOSE
2" REAR DISCHARGE LINE FRONT TO REAR WITH 1 ½” SWING LINE
100'-1 1/2" SCH. 80 STEEL HARDLINE WITH UNIONS-STD
50'-3" SUCTION LINE
SST CONTROL PANEL WITH LOCKING COVER
2 JOY STICK CONTROLS
ANALOG ENGINE RPM
MD TOTCO GAUGE WITH GAUGE PROTECTOR
LCD RATE AND TOTAL
ELECTRONIC THROTTLE
CLUTCH HAND VALVE
HI-PRESSURE AND LO-PRESSURE GAUGES ON PIPING
PROPANE PRESSURE
INLET AND OUTLET TEMP GAUGES ON PIPING
BURNER CONTROLS AND FIRE EXTINGUISHER, REMOTE ACTUATED
8 SWITCH ALPHA PANEL FOR HYD, LIGHTS, SHIFTER ETC
AIR VALVES FOR ALL BUTTERFLY VALVES ON PLUMBING ARE ON DEDICATED TRUCK AIR PRESSURE INDEPENDENT FROM CONTROL PANEL AIR FOR WINTER ISSUES
GREASE ZERKS ACCESSIBLE FROM ONE POINT BY PANEL
CLOTHES BOX BEHIND CAB
AIR VALVES ON PASS SIDE TANK SUCTIONS
HI-TEMP SHUTDOWN
TEMP CONTROLLER NO STEAM ATTACHMENT
784 SPICER TRANSFER CASE TO DRIVE TRIPLEX
COLD WEATHER PACKAGE TO INCLUDE:
-PANEL HEAT STD WITH SST PANEL
-RECIRC LINES EACH COMP. 1"
-HARD MOUNTED GAUGES - NO HOSES
-COIL BYPASS VALVES
PROPANE PUMP SYSTEM ------------------------------------------------- NO
HOSE REEL WITH 75' 1.5" HOT OIL HOSE WITH BUMPER ----------------------------YES
NEW EFI CONTROL SYSTEM ----------------------------------------------NO
4" FLUID END FOR TRIPLEX ------------------------------------------------NO
DOT 412 TANK -------------------------------------------------------------------YES
ADD GARDNER DENVER 600S WITH 4/5" PLUNGERS ------------YES
15K PLUMBING ON THE HP -------------------------------------------------NO
LOAD HOSE ALONG DR. SIDE---YES
Specifications
Year | 2020 |
Condition | Used |
Stock Number | 554 |
Miles | 51,357 |
Hours | 3.462 |