2020 Energy Fabrication Hot Oiler

Sold

2020 Energy Fabrication Hot Oiler

$400,000 (USD)

Available quantity:1

Description

2020 Energy Fabrication Hot Oiler


 7M BTU/HR

2" STD. COIL ASSEMBLY DOMESTIC MATERIAL

ANSUL REMOTE FIRE SUPPRESION

CERAMIC FIBER INSULATION WITH STAINLESS MESH

ECO AIR BURNERS W/ PILOT IGNITION

STEEL VAPORIZER WITH PRE-HEATER

NO SPILL BURNER BOX FLOOR WITH DRAIN

WIND PROOF PILOT FOR BURNER OPERATION


600 S GARDNER DENVER 4.5" PLUNGERS WITH LUBE OIL TANK

2-2" H.P. BALL VALVES WITH HI-TEMP SEATS 6K

1-2" H.P. CHECK VALVE 6K

2" SUCK BACK LINE

1-1" BLEEDER VALVE


3"X2"X13" DURCO CENTRIFUGAL PUMP - HYDRAULIC DRIVE

3" SCH 40 SUCTION PLUMBING WITH BUNA/SST BUTTERFLY VALVES

2" SCH 40 L.P. PLUMBING

7-2" SST JAMESBURY BALL VALVES

1-2" 3,000# COIL CHECK VALVE


3" BOWIE LOAD PUMP - HYDRAULIC DRIVE

3" LOAD & TRANSFER PLUMBING

3-3" OUTLETS, BOTH SIDES AND REAR -3 AIR ACTUATED TANK VALVES

1-2" SUCTION ON PASSENGER SIDE

CHAIN RACK PASSENGER SIDE - NO CHEMICAL TANK

GREASE FITTINGS TO BOWIE & TRIPLEX


75 BBL ROUND STORAGE - NON CODE

DUAL COMPARTMENT- SPLIT 50-25

SST SEE LEVEL GAUGES W BRACKETS ON END OF WALKWAY

VACUUM & PRESSURE EMERGENCY VENT

20" TOP MANWAYS CB WITH 4 LUGS ( CLAY & BAILEY)

1 INTERNAL HEAD

ROLLOVER W/ INTERGRAL SPILL TRAY

POSITIVE TANK VENT SYSTEM

1/4" SHELL & HEAD MATERIAL

INTERNALLY COATED W/ TNEMEC 141

TUBULAR ACCESS LADDER W/ WALKWAY

CLEARANCE LIGHTS AND 5 WORK LIGHTS

LOAD HOSE ALONG DR SIDE


480 GALLON PROPANE TANKS DUAL STACK


HOSE REEL WITH 75’-1 ½” HOT OILER HOSE

2" REAR DISCHARGE LINE FRONT TO REAR WITH 1 ½” SWING LINE


100'-1 1/2" SCH. 80 STEEL HARDLINE WITH UNIONS-STD

50'-3" SUCTION LINE


SST CONTROL PANEL WITH LOCKING COVER

2 JOY STICK CONTROLS

ANALOG ENGINE RPM

MD TOTCO GAUGE WITH GAUGE PROTECTOR

LCD RATE AND TOTAL

ELECTRONIC THROTTLE

CLUTCH HAND VALVE

HI-PRESSURE AND LO-PRESSURE GAUGES ON PIPING

PROPANE PRESSURE

INLET AND OUTLET TEMP GAUGES ON PIPING

BURNER CONTROLS AND FIRE EXTINGUISHER, REMOTE ACTUATED

8 SWITCH ALPHA PANEL FOR HYD, LIGHTS, SHIFTER ETC


AIR VALVES FOR ALL BUTTERFLY VALVES ON PLUMBING ARE ON DEDICATED TRUCK AIR PRESSURE INDEPENDENT FROM CONTROL PANEL AIR FOR WINTER ISSUES

GREASE ZERKS ACCESSIBLE FROM ONE POINT BY PANEL

CLOTHES BOX BEHIND CAB

AIR VALVES ON PASS SIDE TANK SUCTIONS

HI-TEMP SHUTDOWN

TEMP CONTROLLER NO STEAM ATTACHMENT

784 SPICER TRANSFER CASE TO DRIVE TRIPLEX

COLD WEATHER PACKAGE TO INCLUDE:

-PANEL HEAT STD WITH SST PANEL

-RECIRC LINES EACH COMP. 1"

-HARD MOUNTED GAUGES - NO HOSES

-COIL BYPASS VALVES


PROPANE PUMP SYSTEM ------------------------------------------------- NO

HOSE REEL WITH 75' 1.5" HOT OIL HOSE WITH BUMPER ----------------------------YES

NEW EFI CONTROL SYSTEM ----------------------------------------------NO

4" FLUID END FOR TRIPLEX ------------------------------------------------NO

DOT 412 TANK -------------------------------------------------------------------YES

ADD GARDNER DENVER 600S WITH 4/5" PLUNGERS ------------YES

15K PLUMBING ON THE HP -------------------------------------------------

Specifications

Year2020
ConditionUsed
Stock Number553
Miles63,925
Hours4,122